As a reminder, parking fees are now in effect at the 里奇盖特公园路Stations Park-n-Ride as of 2019年10月21日.  了解更多.

新社区的新轨道

The Southeast 铁路 Line opened in 2006 as a 19-mile extension of rail from I-25 & Broadway, with 15 miles along I-25 to Lincoln and an additional 4 miles along I-225 to Parker Road. This extension brings light rail into 孤独的树, 有三个新车Stations和一个额外的,300个停车位. Project design and construction began in 2016, the line opened for service on May 17, 2019.

票价

要花多少钱?

Travel on the Southeast 铁路 Extension will require a 当地的 fare ($3.00美元),地区票价(5美元).25美元)或机场票价(10美元).这取决于你的目的地. 折扣票价 为符合条件者申请. 如欲了解更多有关捷运票价的资料,请浏览我们的 票价页面.

3小时过去

当地的

$3.00
1-2个铁路收费区

区域

$5.25
3个铁路收费区

机场

$10.50
往返DIA

购买门票和一日通票

你可以用现金购买日卡, credit or debit at the ticket vending machines located at any RTD rail station, 或者在 RTD移动票务应用程序. The 当地的 天通过 grants unlimited travel on the Southeast 铁路 Extension for the remainder of the service day. 当地的 天通过 ticket books may be purchased at any RTD销售网点.

了解更多关于自动售票机的信息
了解更多关于一日通票

月票

Take unlimited rides all month on the Southeast 铁路 Extension and beyond with RTD's Regional/机场 月票. 月票可于任何地点购买 RTD销售网点在线,在… RTD移动票务应用程序,或参与 King Soopers和Safeway商店.

了解更多有关月票的资料

电子通和大学通

Service on the Southeast 铁路 Extension is included with all EcoPass, CollegePass, 社区EcoPass cards, including service to and from the Denver 机场 Station on either 用处多 or the 一条线 不另收费.

Stations

RTD董事会批准了一项2.3-mile extension of the existing Southeast 铁路 Line In July 2014. 丹佛东南商业协会, companies and municipalities joined forces to support the new light rail line. The City of 孤独的树 and area stakeholders contributed an unprecedented $25 million, with an additional $3 million of in-kind contributions, 土地和路权.

The 当地的 match of approximately 12 percent of the project cost far exceeded the 2.5%匹配RTD要求其当地合作伙伴, helped RTD successfully secure federal funding for the project. RTD received $92 million from the Federal Transit Administration Small Starts funding program, 还有9美元.4 million from Congestion Mitigation and Air Quality grant funds. 这个项目的总费用是233美元.100万年.

缩略图

林肯Stations

  • 地址:

    10203车Stations道
    孤独的树, CO 80124
    美国

  • 停车场: 1734的空间
  • 自行车停车: 是的
  • 连接铁路线:
  • 接驳巴士路线:
  • FlexRides:
缩略图

天岭Stations

  • 地址:

    9941火车Stations环线
    孤独的树, CO 80124
    美国

  • 停车场: No
  • 自行车停车: 是的
  • 连接铁路线:
  • FlexRides:
缩略图

孤树市中心车Stations

  • 地址:

    山脊门大街11023号
    孤独的树, CO 80134
    美国

  • 停车场: No
  • 自行车停车: No
  • 连接铁路线:
缩略图

里奇盖特公园路Stations

  • 地址:

    哈瓦那大街10791号
    孤独的树, CO 80134
    美国

  • 停车场: 1300的空间
  • 自行车停车: 是的
  • 连接铁路线:

停车

停车:

  • 停车 at the RidgeGate Parkway Park-n-Ride will be fee-based parking effective 2019年10月21日. 学习 如何停车 在RTD设施.

  • 停车 fees at RTD Park-n-Rides depends on if your car is registered within the RTD service area. 看看 如何停车.

  • If your vehicle is registered within the RTD service area, parking at RTD Park-n-Rides is free for the first 24 hours. 24小时后,a $2.00日费 适用于. 你必须在上车前付钱.

  • If your vehicle is registered out of district, a $4.00日费 适用于. 你必须在上车前付钱.

  • 安全提示: 不要让人知道你不在. Take your parking receipt with you and do not leave it on your dash.

  • Vehicles may not be parked continuously for longer than 30 consecutive days. Vehicles parked greater than 30 consecutive days without being moved may be subject to ticketing and towing at the owners expense.

如何支付停车费

现场支付

排队停车

寻找蓝色的天篷和亭子. You can pay in cash (exact change) or credit card.

电话付款

电话付款

呼叫 1-877-727-5951 (以电话付款只收取象征性的费用).

在线支付

ParkMobile -停车变得简单

www.parkmobile.com 或下载Parkmobile应用程序.

You must pay onsite, prior to leaving your vehicle. Non-payment of applicable parking fees will result in a fine. Take your paid parking ticket with you – be safe and don’t leave it on your dash.

时间轴

2010
Final Environmental Evaluation, initiated in 2008, 30% basic engineering completed
2011
Project team began an Environmental Assessment (EA) to pursue federal funding
2012
Work on advanced basic engineering and coordination of the project scope with stakeholders. Small Starts application process proceeds through the grant development and engineering phases.
2014
The FTA signed the Finding of No Significant Impact, which concludes the EA undertaken to fulfill the requirements of the National Environmental Policy Act, a requirement for eligibility for federal funding
2015
Project becomes part of President Obama's 2016 budget. RTD 董事会 approves a $140 million two-phased contract award to Balfour Beatty Infrastructure Inc. (BBII) to design and build the Southeast 铁路 Extension.
2016
Budget and funding grant signed, with Notice to Proceed 2 (NTP2). 2016年5月16日开始建设.
2017
Project reached 50 percent completion milestone in May 2017. 到2017年底, 获得了所有的通行权, the three bridges for the project were nearly complete, 三个车Stations的月台都被浇筑了水, all three Traction Power SubStations were installed and substantial progress was made on the RidgeGate parking structure.
2018
Existing light rail service was successfully tied together with the 2.3-mile extension of the E, F and R lines south of 林肯Stations in March 2018. Project entered “integrated testing” phase in November 2018 to examine all components of the rail system and correct any issues. Project reached substantial completion of construction, 包括桥梁, Stations, 轨道和公用事业, 2018年12月. 到2018年底, lines were energized and test trains began running to verify the line is safe and working properly.
2019
Integrated testing of trains and signal systems continued into 2019. Next, the pre-revenue testing phase began, which simulates passenger service. The E, F, R Line Extension opened for service on May 17, 2019.